IT
WORK ORDERSWO-2026-0464
WO-2026-0464In ProgressMediumPreventive

GEN-004 — Shindaiwa DGW500 Welder/Gen

Created 2026-05-14 · Assigned to D. Wilson

GEN-004
D. Wilson
2026-05-12

500-Hour Service — auto-generated from PM schedule PM-001. Due: 2026-05-12

0/14 done
Check engine oil level and condition
Inspect coolant level and overflow tank
Check belt tension and wear condition
Inspect battery terminals and state of charge
Perform load test at rated kW capacityCRITICAL
Check fuel system — lines, filter, regulator
Inspect exhaust manifold and connections
Record hour meter reading
Check air/fuel ratio — adjust if required
Inspect spark plugs — replace if worn
Check ignition timing
Inspect turbocharger (if equipped)
Check crankcase breather
Inspect all gaskets and seals for leaks

Complete all 14 items to submit

Regular Labour (0.00h × $95/h)$0.00
OT Labour (0.00h × $143/h)$0.00
Parts & Materials$0.00
TOTAL$0.00

Complete the WO to record labour and finalize cost

0 items

NO PARTS LOGGED YET

Note2026-05-14· D. Wilson

Work order WO-2026-0464 created — 500-Hour Service — auto-generated from PM schedule PM-001. Due: 2026-05-12

📷
Before / After / Damage

Photos are attached to this work order and included in the submission package. Tap a photo to add a caption describing what you found.