WORK ORDERSWO-2026-0456
WO-2026-0456CompletedLowInspection
LT-001 — Magnum 6kW LED Light Tower
Created 2026-05-13 · Assigned to D. Wilson
COMPLETED 2026-05-08
JOB DESCRIPTION
Monthly field inspection. Check all lights, engine oil, fuel level, tire pressure.
Cost Breakdown
Regular Labour (1.50h × $95/h)$142.50
OT Labour (0.00h × $143/h)$0.00
Parts & Materials$0.00
TOTAL$142.50
Parts & Materials
2 itemsEngine Oil 5W-30 4L
P/N: ENG-OIL-5W30-4L
1.00 jug × $0.00
$0.00
Engine Oil 5W-30 4L
P/N: ENG-OIL-5W30-4L
1.00 jug × $0.00
$0.00
PARTS TOTAL$0.00
| Part # | Description | Qty | Unit | Unit Cost | Total |
|---|---|---|---|---|---|
| ENG-OIL-5W30-4L | Engine Oil 5W-30 4L | 1.00 | jug | $0.00 | $0.00 |
| ENG-OIL-5W30-4L | Engine Oil 5W-30 4L | 1.00 | jug | $0.00 | $0.00 |
| PARTS TOTAL | $0.00 | ||||
📷
Before / After / DamageWork Order Photos
Photos are attached to this work order and included in the submission package. Tap a photo to add a caption describing what you found.